What we do
Four lines of work, one standard.
Each engagement works on a layer of the system that decides how projects are selected, governed, delivered and reported. The layers are kept distinct so that impact identification, governance, competence and reporting can each be tested on their own terms.
Policy and governance
Governance for boards and leadership teams: accountability, decision rights, and disclosure controls aligned to IFRS S1 and S2, the GRI Standards and CSRD. You receive a governance framework, a policy set and a control map that an assurance provider can follow.
Output: governance framework, policies, control map
Method tailoring
Adapting the P5 Standard and the PRiSM™ lifecycle to your structure, risk exposure and decision model without changing the standard's intent or integrity. The P5 Impact Analysis and the Sustainability Management Plan are built into your templates and gate criteria.
Impact thresholds and regeneration
Setting the thresholds that decide when an impact is material, and the baselines that let you show regeneration as measured enhancement of social, ecological or economic capacity beyond baseline, monitored over a defined period.
Output: threshold and baseline register, monitoring plan
PMO and delivery support
Strategize, establish, scale or optimize a PMO that owns sustainability criteria at each gate, aggregates impact across the portfolio and reports a maturity trajectory to the board. Support runs from strategy through to day-to-day delivery on live projects.
How an engagement runs
Diagnose, design, embed, measure.
Every engagement starts with a discovery session and is scoped in writing before work begins. Most follow the same four stages, and each stage produces something you keep.
Diagnose
A baseline of where commitments are applied and where they are not. For project-based organizations this is usually the PSM3™ Sustainability Maturity Index; for the whole enterprise, OSEM.
Design
Governance, method, thresholds and reporting designed against the baseline and your disclosure obligations, with owners named for each control.
Embed
Templates, gate criteria and training put to work on live projects, with the people who own the criteria trained to threshold competence.
Measure
Sustainability in status reporting and closure, adoption counted across projects, and an annual re-assessment that shows the trajectory to the board.
What you receive
Assets your organization keeps, and can be audited on.
Consulting that ends in a slide deck leaves the delivery system as it was. GPM engagements end in documents, templates, criteria and trained people that stay in place after we leave, and that an assurance provider can test against IFRS S1 and S2, GRI or CSRD.
Where an engagement began with a PSM3™ or OSEM baseline, the same instrument is used to measure what changed.
Typical deliverables
Governance framework, policy set and control map
Tailored P5 and PRiSM™ method assets: templates, gate criteria, P5 Impact Analysis and Sustainability Management Plan
Threshold and baseline register with a monitoring plan
PMO operating model and portfolio reporting
Training for the people who own each criterion
Reporting mapped to GRI, TCFD and ISSB through the P5 crosswalk
Why GPM
We wrote the standard we implement.
GPM is the architect of the P5 Standard, now published with the Project Management Institute as the PMI GPM P5 Standard for Sustainability in Project Management, Version 4.0, and of the PRiSM™ delivery method. Every element of the standard is crosswalked to the SDGs, GRI, TCFD and ISSB, so the governance and methods we install trace to the disclosure regimes your organization reports under.
GPM is a member of the IFRS Sustainability Consultant Content Program, which keeps our advice aligned with the IFRS S1 and S2 baseline for sustainability-related financial disclosure. Our research base draws on GPM Insights surveys of more than 10,000 professionals in 113 countries, and our consultants have delivered work worldwide across energy, finance, property and manufacturing.
Assessments and tailoring are carried out by certified GPM assessors and consultants, held to GPM's own competence standard for sustainability leadership.


Who we work with
The people who set commitments and the people who deliver them.
Boards and Chief Sustainability Officers
who need governance that reaches into projects, and disclosure controls that hold up under assurance.
PMO and portfolio leaders
who need a method their teams will apply, criteria at each gate, and a number to report each year.
Owners of capital programs
who need business cases, procurement and supplier requirements that carry the organization's commitments into contracts.
Reporting teams preparing for ISSB, CSRD or assurance
who need project-level evidence behind enterprise disclosures, mapped to the standards they report under.
Questions we are asked
Before you request a scoping call.
How does an engagement start?
With a discovery session of two to three hours to understand your structure, obligations and priorities. You then receive a written scope, timing and team before any work begins.
Do we need a PSM3™ assessment first?
Not always, but a baseline makes the design stage faster and lets you measure what changed. The free PSM3™ self-check is a reasonable first step; a validated assessment is the stronger one.
Do you change the P5 Standard to fit us?
No. Tailoring adapts how the standard is interpreted and applied in your context. Its categories, elements, lenses and intent stay intact, which is what keeps your reporting traceable to GRI, TCFD and ISSB.
How do you work with our auditors and assurance providers?
Every control we design has a named owner and an evidence source, and the P5 crosswalk shows which disclosure topic it supports. We will walk your assurance provider through the control map on request.
Where do you work?
GPM has delivered engagements worldwide. Discovery, design and most training run remotely; assessments and embedding work are done on site where the projects are.
What does regeneration mean in your work?
Measurable enhancement of the capacity of a social, ecological or economic system beyond its baseline, with indicators, a transparent method and monitoring over a defined period. Claims without a baseline are not treated as regeneration.
Request a scoping call
Tell us what needs to change.
Describe your organization, the obligations you report under and what prompted the inquiry. A certified GPM consultant will come back to you with a proposed scope and timing.